JOIN PROCESS

From initial assessment to a 90-day standardization plan.

Before integration, GTB reviews law, licenses, tax, labor, residence status, data and risk. The BU proposes and operates its own business model; participation in the GTB system, use of GTB name, representative authority or risk-bearing scope expansion requires GTB approval.

01 · Pre-check

Confirm the minimum conditions

GTB confirms the model, accountable entity, BU execution contact, operating location, critical licenses, integration purpose and urgent issues.

02 · Diagnostic

Run a 360° operating review

Review six layers: legal and licensing; finance and tax; contracts; labor; data; process and governance accountability.

03 · Roadmap

Agree the 90-day plan

Set priorities, owners, required records, metrics and the boundaries between GTB, the BU and external licensed specialists.

Fit Check 360° Diagnostic 90-day Plan

FIT CRITERIA

GTB proceeds only when the conditions for real change exist.

GTB integrates only when the legal basis, residence status, reviewable data, required licenses and durable controls are in place.

AUTHORITY

GTB decides participation scope and governance standards

The BU supplies data, explains operating facts and proposes options. GTB Holdings assesses law, risk and resources, then determines the participation scope, governance standards and any necessary limitations.

DATA

There is evidence to diagnose

At minimum: entity records, revenue and costs, main contracts, workforce information and a list of current issues.

COMMITMENT

The BU is ready to standardize

The BU accepts deadlines, accountable owners, recurring review and correction of non-conforming items while continuing to operate its own business model.

Practical joining timeline

Days 0–7 Initial discussion, confidentiality arrangement if needed, checklist and priority documents.
Days 8–21 BU operator interviews, data review, risk map and identification of matters for licensed specialists.
Days 22–45 GTB and the BU agree the governance support scope, baseline metrics, 90-day plan, approval points and reporting rhythm.
Days 46–90 Implement priority controls, train BU operators, run the first monthly pack and obtain GTB’s formal integration decision.

CONTACT

Contact GTB Holdings

Start with a private business discussion with GTB Holdings.
Advisory contact